{"id":10165,"date":"2018-05-04T11:39:12","date_gmt":"2018-05-04T06:09:12","guid":{"rendered":"http:\/\/race4job.com\/blog\/?p=10165"},"modified":"2018-05-04T11:39:12","modified_gmt":"2018-05-04T06:09:12","slug":"quantitative-aptitude-62","status":"publish","type":"post","link":"https:\/\/www.race4job.com\/blog\/quantitative-aptitude-62\/","title":{"rendered":"Quantitative Aptitude"},"content":{"rendered":"<div style=\"background-color: #aebc9e; padding: 10px; margin-bottom: 5px; color: black;\">1. If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be:\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<span style=\"color: #0000ff;\"><strong>(1)<\/strong><\/span><\/p>\n<ol>\n<li style=\"list-style: none;\">1. 4 days<\/li>\n<li style=\"list-style: none;\">2. 5 days<\/li>\n<li style=\"list-style: none;\">3. 6 days<\/li>\n<li style=\"list-style: none;\">4. 7 days<\/li>\n<\/ol>\n<\/div>\n<div style=\"background-color: #aebc9e; padding: 10px; margin-bottom: 5px; color: black;\">2. A can do a piece of work in 4 hours; B and C together can do it in 3 hours, while A and C together can do it in 2 hours. How long will B alone take to do it?\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<span style=\"color: #0000ff;\"><strong>(3)<\/strong><\/span><\/p>\n<ol>\n<li style=\"list-style: none;\">1. 8 hours<\/li>\n<li style=\"list-style: none;\">2. 10 hours<\/li>\n<li style=\"list-style: none;\">3. 12 hours<\/li>\n<li style=\"list-style: none;\">4. 24 hours<\/li>\n<\/ol>\n<\/div>\n<div style=\"background-color: #aebc9e; padding: 10px; margin-bottom: 5px; color: black;\">3. A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C lone in 50 days, then B alone could do it in:\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<span style=\"color: #0000ff;\"><strong>(3)<\/strong><\/span><\/p>\n<ol>\n<li style=\"list-style: none;\">1. 15 days<\/li>\n<li style=\"list-style: none;\">2. 20 days<\/li>\n<li style=\"list-style: none;\">3. 25 days<\/li>\n<li style=\"list-style: none;\">4. 30 days<\/li>\n<\/ol>\n<\/div>\n<div style=\"background-color: #aebc9e; padding: 10px; margin-bottom: 5px; color: black;\">4. A machine P can print one lakh books in 8 hours, machine Q can print the same number of books in 10 hours while machine R can print them in 12 hours. All the machines are started at 9 A.M. while machine P is closed at 11 A.M. and the remaining two machines complete work. Approximately at what time will the work (to print one lakh books) be finished ?\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<span style=\"color: #0000ff;\"><strong>(4)<\/strong><\/span><\/p>\n<ol>\n<li style=\"list-style: none;\">1. 11:30 A.M.<\/li>\n<li style=\"list-style: none;\">2. 12 noon<\/li>\n<li style=\"list-style: none;\">3. 12:30 P.M.<\/li>\n<li style=\"list-style: none;\">4. 1:00 P.M.<\/li>\n<\/ol>\n<\/div>\n<div style=\"background-color: #aebc9e; padding: 10px; margin-bottom: 5px; color: black;\">5. A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 <span style=\"color: #0000ff;\"><strong>(2)<\/strong><\/span><\/p>\n<ol>\n<li style=\"list-style: none;\">1. 12 days<\/li>\n<li style=\"list-style: none;\">2. 15 days<\/li>\n<li style=\"list-style: none;\">3. 16 days<\/li>\n<li style=\"list-style: none;\">4. 18 days<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>1. If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be:\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-10165","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts\/10165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/comments?post=10165"}],"version-history":[{"count":1,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts\/10165\/revisions"}],"predecessor-version":[{"id":10166,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts\/10165\/revisions\/10166"}],"wp:attachment":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/media?parent=10165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/categories?post=10165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/tags?post=10165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}