{"id":13486,"date":"2019-05-20T10:34:27","date_gmt":"2019-05-20T05:04:27","guid":{"rendered":"http:\/\/race4job.com\/blog\/?p=13486"},"modified":"2019-05-20T10:34:27","modified_gmt":"2019-05-20T05:04:27","slug":"rrb-je-mock-test-2019-16","status":"publish","type":"post","link":"https:\/\/www.race4job.com\/blog\/rrb-je-mock-test-2019-16\/","title":{"rendered":"RRB JE Mock Test 2019"},"content":{"rendered":"<div style=\"background-color: #a1d490; padding: 10px; margin-bottom: 5px; color: black;\"><strong>1.<\/strong>\u00a0 A train travels 500 m in first minute. In the next 4 minutes, it travels in each minute 125 m more than that in the previous minute. The average speed per hour of the train during those 5 minutes will be\u00a0 \u00a0 \u00a0 \u00a0\u00a0<span style=\"color: #0000ff;\"><strong>(2)<\/strong><\/span><\/p>\n<ol>\n<li style=\"list-style-type: none;\"><strong>1.<\/strong> 30 km\/hr<\/li>\n<li style=\"list-style-type: none;\"><strong>2.<\/strong> 45 km\/hr<\/li>\n<li style=\"list-style-type: none;\"><strong>3.<\/strong> 50 km\/hr<\/li>\n<li style=\"list-style-type: none;\"><strong>4.<\/strong> 55 km\/hr<\/li>\n<\/ol>\n<\/div>\n<div style=\"background-color: #a1d490; padding: 10px; margin-bottom: 5px; color: black;\"><strong>2.<\/strong> If p\u00b2\/q\u00b2 +q\u00b2\/p\u00b2 = 1, then the value of (p\u2076 + q\u2076) is\u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<span style=\"color: #0000ff;\"><strong>(1)<\/strong><\/span><\/p>\n<ol>\n<li style=\"list-style-type: none;\"><strong>1.<\/strong> 0<\/li>\n<li style=\"list-style-type: none;\"><strong>2.<\/strong> 1<\/li>\n<li style=\"list-style-type: none;\"><strong>3.<\/strong> 2<\/li>\n<li style=\"list-style-type: none;\"><strong>4.<\/strong> 3<\/li>\n<\/ol>\n<\/div>\n<div style=\"background-color: #a1d490; padding: 10px; margin-bottom: 5px; color: black;\"><strong>3.<\/strong> If (m + 1) = \u221an + 3, the value of 1\/2 ((m\u00b3 \u2013 6m\u00b2 + 12m \u2013 8)\/\u221an-n) is\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<span style=\"color: #0000ff;\"><strong>(1)<\/strong><\/span><\/p>\n<ol>\n<li style=\"list-style-type: none;\"><strong>1.<\/strong> 0<\/li>\n<li style=\"list-style-type: none;\"><strong>2.<\/strong> 1<\/li>\n<li style=\"list-style-type: none;\"><strong>3.<\/strong> 2<\/li>\n<li style=\"list-style-type: none;\"><strong>4.<\/strong> 3<\/li>\n<\/ol>\n<\/div>\n<div style=\"background-color: #a1d490; padding: 10px; margin-bottom: 5px; color: black;\"><strong>4.<\/strong> If x=(a \u2013 b)\/(a + b),y=(b \u2013 c)\/(b + c),z=(c \u2013 a)\/(c + a), then ((1 \u2013 x)(1 \u2013 y)(1 \u2013 z))\/((1 + x)(1 + y)(1 + z)) is equal to\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0<span style=\"color: #0000ff;\"><strong>(1)<\/strong><\/span><\/p>\n<ol>\n<li style=\"list-style-type: none;\"><strong>1.<\/strong> 1<\/li>\n<li style=\"list-style-type: none;\"><strong>2.<\/strong> 0<\/li>\n<li style=\"list-style-type: none;\"><strong>3.<\/strong> 2<\/li>\n<li style=\"list-style-type: none;\"><strong>4.<\/strong> 1\/2<\/li>\n<\/ol>\n<\/div>\n<div style=\"background-color: #a1d490; padding: 10px; margin-bottom: 5px; color: black;\"><strong>5.<\/strong> If (\u221a7 \u2013 1)\/(\u221a7 + 1)-(\u221a7 + 1)\/(\u221a7 \u2013 1)=a+\u221a7 b, then the values of a and b are respectively\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<span style=\"color: #0000ff;\"><strong>(3)<\/strong><\/span><\/p>\n<ol>\n<li style=\"list-style-type: none;\"><strong>1.<\/strong> \u221a7, \u20131<\/li>\n<li style=\"list-style-type: none;\"><strong>2.<\/strong> \u221a7, 1<\/li>\n<li style=\"list-style-type: none;\"><strong>3.<\/strong> 0, -2\/3<\/li>\n<li style=\"list-style-type: none;\"><strong>4.<\/strong> -2\/3, 0<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>1.\u00a0 A train travels 500 m in first minute. In the next 4 minutes, it travels in each minute 125 m more than that in the previous minute. The average speed per hour of the train during those 5 minutes will be\u00a0 \u00a0 \u00a0 \u00a0\u00a0(2) 1. 30 km\/hr 2. 45 km\/hr 3. 50 km\/hr 4. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-13486","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts\/13486","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/comments?post=13486"}],"version-history":[{"count":1,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts\/13486\/revisions"}],"predecessor-version":[{"id":13491,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts\/13486\/revisions\/13491"}],"wp:attachment":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/media?parent=13486"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/categories?post=13486"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/tags?post=13486"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}