{"id":5554,"date":"2016-12-09T17:12:58","date_gmt":"2016-12-09T11:42:58","guid":{"rendered":"http:\/\/race4job.com\/blog\/?p=5554"},"modified":"2016-12-09T17:13:31","modified_gmt":"2016-12-09T11:43:31","slug":"ibps-clerks-questions-quantitative-aptitude-11","status":"publish","type":"post","link":"https:\/\/www.race4job.com\/blog\/ibps-clerks-questions-quantitative-aptitude-11\/","title":{"rendered":"IBPS CLERKS Questions On Quantitative Aptitude"},"content":{"rendered":"<p><span style=\"color: #ff0000;\">1. Two persons A and B together can complete a piece of work in 9 days. B alone can do that work in 36 days. In how many days can A alone can complete that work?<\/span> <span style=\"color: #0000ff;\">\u00a0(3)<\/span><br \/>\n<span style=\"color: #000000;\">1) 16 days<\/span><br \/>\n<span style=\"color: #000000;\"> 2) 18 days<\/span><br \/>\n<span style=\"color: #000000;\"> 3) 12 days<\/span><br \/>\n<span style=\"color: #000000;\"> 4) 24 days<\/span><br \/>\n<span style=\"color: #000000;\"> 5) None of these<\/span><\/p>\n<p><span style=\"color: #ff0000;\">2. A and B can do a work in 20 days and 12 days respectively. They worked together on it for some time, C joins and finishes in 2 days. If C can do the total work in 10 days, how long did A and B together work?<\/span> \u00a0<span style=\"color: #0000ff;\">(1)<\/span><br \/>\n<span style=\"color: #000000;\">1) 6 days<\/span><br \/>\n<span style=\"color: #000000;\"> 2) 8 days<\/span><br \/>\n<span style=\"color: #000000;\"> 3) 10 days<\/span><br \/>\n<span style=\"color: #000000;\"> 4) 5 days<\/span><br \/>\n<span style=\"color: #000000;\"> 5) None of these<\/span><\/p>\n<p><span style=\"color: #ff0000;\">3. A, B and C can do a piece of work in 30days, 24 days and 40 days respectively. They started working together but C left four days before the completion of the work. In how many days was the work finished?<\/span> \u00a0<span style=\"color: #0000ff;\">(2)<\/span><br \/>\n<span style=\"color: #000000;\">1) 5 days<\/span><br \/>\n<span style=\"color: #000000;\"> 2) 11 days<\/span><br \/>\n<span style=\"color: #000000;\"> 3) 12 days<\/span><br \/>\n<span style=\"color: #000000;\"> 4) 8 days<\/span><br \/>\n<span style=\"color: #000000;\"> 5) None of these<\/span><\/p>\n<p><span style=\"color: #ff0000;\">4. 72 men can complete a piece of work in 48 days. In how many days can 54 men finish the same work? <span style=\"color: #0000ff;\">\u00a0<\/span><\/span><span style=\"color: #0000ff;\">(4)<\/span><br \/>\n<span style=\"color: #000000;\">1) 46 days<\/span><br \/>\n<span style=\"color: #000000;\"> 2) 68 days<\/span><br \/>\n<span style=\"color: #000000;\"> 3) 32 days<\/span><br \/>\n<span style=\"color: #000000;\"> 4) 64 days<\/span><br \/>\n<span style=\"color: #000000;\"> 5) None of these<\/span><\/p>\n<p><span style=\"color: #ff0000;\">5. If 2 men and 3 boys can do a piece of work in 8 days and 3 men and 2 boys can do it in 7 days. In how many days will 5 men and 4 boys take to complete it?<\/span> \u00a0<span style=\"color: #0000ff;\">(1)<\/span><br \/>\n<span style=\"color: #000000;\">1) 4 days<\/span><br \/>\n<span style=\"color: #000000;\"> 2) 6 days<\/span><br \/>\n<span style=\"color: #000000;\"> 3) 7 days<\/span><br \/>\n<span style=\"color: #000000;\"> 4) 3 days<\/span><br \/>\n<span style=\"color: #000000;\"> 5) None of these<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>1. Two persons A and B together can complete a piece of work in 9 days. B alone can do that work in 36 days. In how many days can A alone can complete that work? \u00a0(3) 1) 16 days 2) 18 days 3) 12 days 4) 24 days 5) None of these 2. A [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-5554","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts\/5554","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/comments?post=5554"}],"version-history":[{"count":1,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts\/5554\/revisions"}],"predecessor-version":[{"id":5555,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/posts\/5554\/revisions\/5555"}],"wp:attachment":[{"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/media?parent=5554"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/categories?post=5554"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.race4job.com\/blog\/wp-json\/wp\/v2\/tags?post=5554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}